Short answer: data centres used about 415 TWh of electricity worldwide in 2024, roughly 1.5% of global demand, and the IEA expects that to reach around 945 TWh by 2030. In the US the share was 4.4% in 2023 and could be 6.7% to 12% by 2028. PUE has barely moved: Uptime's 2025 average is 1.54, and its survey says the headline figure has virtually stood still for six years.

A lot of the data centre power figures that get passed around online have no source attached. This page keeps the main ones in one place, each linked to where it came from. Use any of them. A link back is appreciated.

Global demand

Figure Value Source
Global data centre electricity use, 2024 ~415 TWh (~1.5% of world electricity) IEA, Energy and AI
Growth over the last five years ~12% per year IEA
Base case for 2030 (April 2025 report) ~945 TWh (just under 3%) IEA
Later IEA update 485 TWh in 2025 → 950 TWh in 2030, so the 2030 view is essentially unchanged IEA, Key Questions on Energy and AI
Share of 2024 use by region US 45%, China 25%, Europe 15% IEA report PDF

United States

Figure Value Source
Data centre electricity use, 2014 → 2023 58 TWh → 176 TWh US DOE
Share of US electricity, 2023 4.4% LBNL 2024 report
Range for 2028 325–580 TWh, 6.7%–12.0% LBNL
Implied capacity, assuming 50% average utilisation 74–132 GW LBNL

Efficiency (PUE)

Figure Value Source
Global weighted average PUE, 2025 1.54 (n=681) Uptime Institute Global Survey 2025
Average PUE in 2007 and 2014 2.5 and 1.65 Uptime 2025
Middle East and Africa average 1.68 (n=79) Uptime regional view 2025
North America average 1.49 (n=111) Uptime regional view 2025
Respondents working in facilities 16+ years old 27.5% Uptime 2025

What I take from this

The headline growth is real, but it lands in a few places. The IEA notes that nearly half of US data centre capacity sits in five regional clusters, so the strain is local. So for any one site, the useful question is less "how big can we go" and more "how much power does this site actually have, and when". That's the number we design around.

The PUE gap between the Middle East (1.68) and North America (1.49) is the other one worth watching. Uptime's data doesn't split the gap by cause. Climate, fleet age and who answered the survey all likely play a part. Note that Middle East and Africa is one region in Uptime's data, there is no separate Gulf figure, and the sample is small (79).

Last checked: 30 October 2026. If a source updates, I update the table and the date.