Plan your data centre
Guides
Practical notes for planning data centre power, cooling and delivery. Start with the constraint or service that matters to your site.
By grid situation
- Limited grid power: plan a data centre in phases
Use the available grid capacity to size phase 1 and leave room to grow.
- Unreliable grid power: design the whole backup chain
Plan UPS, generators, fuel and transfers around the outages your site faces.
- Off-grid data centres: solar, storage and firm power
Balance continuous demand with solar output, battery storage and firm supply.
By climate
- Data centre cooling in a hot, humid climate
Choose cooling around local humidity, dew point and rack inlet conditions.
- Data centre cooling in a hot, dry climate
Plan heat rejection, water use and dust protection for hot, dry conditions.
By buyer
- Planning a data centre for a telecom operator
Bring power, cooling, fibre routes and service continuity into one plan.
- Planning a government or national data centre
Plan service migration, recovery, operations and handover from the start.
- Modular data centres for small sites
Check module size, delivery access and the connections needed for expansion.
Start with your four inputs: site, IT load, available power and target date.
Try the estimator →Send your four inputs →